Track record for wind projects

Owners and operators have enjoyed our transport services in the construction of some of the largest wind farms worldwide

Worldwide wind expertise

Handling delicate wind turbine components is a logistical challenge. That is why working with an experienced partner is crucial. We aim at doing more than fulfilling your expectations – we aim at exceeding them.

Tahkolouto Offshore Wind Farm

Period: March - July 2017

 

  • Stevedoring & Chartering
  • Naval Engineering
  • Sea transport
  • Hub Logistics Services
  • Loadout of components
  • Heavy Lift
  • Site Management
Download (pdf)

Block Island Wind Farm

Period: 2015-2016

 

  • Hub logistics services
  • Discharging tower sections and blades
  • Transfer to quayside
  • Loadout of components on barges
  • Heavy lift
  • Storage
  • Warehouse management
Download (pdf)

Pililla Wind Farm transport

Period: 2014-2015

 

  • Chartering
  • Port storage operation
  • Project Management
  • Road survey
  • Heavy Haulage
  • Turn key logistics
Download (pdf)

Jacket foundations Baltic II

Period: 2014-2015

 

  • 24/7 service
  • In-house office facilities
  • Technical management
  • Operation of barges and tug boats
Download (pdf)

Gwynt y Môr

Period: 2013

 

  • Port Agency
  • Stevedoring
  • Developing new equipment
  • Ro/Ro
Download (pdf)

Anholt

Period: 2011-2013

 

  • one-point-of-contact for all marine-related services
  • Stevedoring
  • Agency services
Download (pdf)

London Array

Period: 2011-2012

 

  • Stevedoring
  • Loading turbines
  • HSSEQ
Download (pdf)

Horns Rev I & II

Period: 2002 & 2008-2009

 

  • one-stop-shop concept
  • Port agency, stevedoring and terminal handling
  • Stevedoring for the jack-up barge “Sea Jack”
  • First large offshore wind project
Download (pdf)